09/28/15 – Interior Demolition of Additions Leave a reply As purchased with new walls added at original office area for Clauss. With first wall removed. With second layer removed exposing Master Bedroom. As originally intended, with open, flexible plan on upper level Early AM sunrise. Existing closet additions. Existing closets removed. View from Master Bedroom through office space into main living room. View out from Master Bedroom. In process of office space, door into Master Bedroom.
01/04/16 – Progress Photos Leave a reply Preservation Progress – Roof Removal and TPO Installation for House A Existing roof addition by previous owner. Tongue and groove wood decking after metal, EPDM and built-up roofs were removed. Roof installation in process. The next AM after removal, returning it back to its original form.